Funk Boiler Works Inc.

Wayne L. Goldsmith, President
Eric Goldsmith, Vice-President
Richard Cassella, Manager

Emergency Service 24/7

 

Contact Info

18 Norwalk Street
West Haven, CT 06516
Sales & Service
Phone: 203-934-3066
Email: funkboilerworks@sbcglobal.net
CT License HTG.0300870-S1
CT DAS Prequalified

New, Used and Portable Boilers

Boiler Service/Repair
Boiler Installation/Replacement
Temporary Boiler Installations    
Portable Boilers 2-4 mm BTU
Emergency Hot Water/Heat
Domestic Hot Water
Upgrading of Gas or Oil-Fired Equipment

Funk Boiler Projects in Connecticut

The Knights of Columbus Supreme Council Office located at 100 Church Street in New Haven, Connecticut is a 23-story high rise surrounded by glass. After a customized Energy Efficiency Analysis, Funk removed old gas boilers and installed a new primary/secondary system multi-blower installation piper primary/secondary with conventional gas boilers. As a result, this corporate headquarters saves over 26% on overall heating and cooling costs per year.

A featured article ("Commercial Installer Helps School Increase Heating Efficiency") in the February, 2005, issue of Oil & Energy reported at length about our service and customized Energy Efficiency Analysis service. Several examples are noted where substantial savings were realized by our customers.

The home page image (right) shows the KofC system in New Haven, a  Funk Boiler Works removed an old gas installation and installed these gas boilers.

 

References

Albertus Magnus College St. John the Baptist
Buckingham Apartments St. Lawrence Church
Christ Church St. Louis School (W. Haven)
Cosmo's St. Mary's Rectory
Darien Public Schools St. Rose Convent
First Baptist Church New Haven St. Vincent De Paul Church
First Church of Christ St. Vincent De Paul School
Guilford High School Stonington High School
Guilford Middle School Stop & Shop
Hays School The Hotel Duncan
Knights of Columbus Town of Branford
North Haven Public Schools Town of Clinton - Town Hall
Notre Dame High School Town of Milford - Board of Ed.
Orange Cong. Church Town of Madison
Our Lady Queen of Angels Preschool Town of North Haven
Pierson Middle School
Town of Madison
Trinity Lutheran Church
Plymouth Town Hall Viaduct
Redstone manor Viking Tool Company
Roy Realty Yale Medical Center
St. Aloysius Church Yale University
St. Christopher's School Yale School of Nursing
c/o US Prop.

 

Similar Experience

Here is a list of our experience with similar types of work:

Yale Medical Center – Numerous steam boilers dating back 25 years and older.
Valerie Wohlstrom

Milford Schools – Numerous steam boiler installations, more than 10 in different schools, including trap replacements in the tunnels, steam modifications and upgrades.
Pat Bradbury

Guilford Schools – Boiler replacements at both the high school and middle school.
Ed Harlow

Clinton Town Hall – Steam boiler replacement and design / build over 25 years old.
Tom Fitting

Knights of Columbus – Boiler replacement design / build for one of the largest buildings in New Haven.
Paul Bello

Redstone Manor – Steam boiler replacement and design / build. Property has over 10 million BTUs and has been converted from oil to gas oil, which also includes a domestic water system. This job was finished in the fall of 2007.
George Passander

Off Broadway Management – The properties were Yale University, numerous steam boilers designs and builds.
Joe Matteis

North Haven Schools – Boiler installations, boiler design / builds, emergency portable boiler rentals. Please note we have our own portable boilers, which can supply heat in an emergency within hours to any of the North Haven Schools.
Grant Pecham

Stonington Public Schools – Very similar project to design #1.

Jamie Boss – H.B. Smith boilers.