Funk Boiler Projects in Connecticut
The Knights of Columbus Supreme Council Office located at 100 Church Street in New Haven, Connecticut is a 23-story high rise surrounded by glass. After a customized Energy Efficiency Analysis, Funk removed old gas boilers and installed a new primary/secondary system multi-blower installation piper primary/secondary with conventional gas boilers. As a result, this corporate headquarters saves over 26% on overall heating and cooling costs per year.
A featured article ("Commercial Installer Helps School Increase Heating Efficiency") in the February, 2005, issue of Oil & Energy reported at length about our service and customized Energy Efficiency Analysis service. Several examples are noted where substantial savings were realized by our customers.
The home page image (right) shows the KofC system in New Haven, a Funk Boiler Works removed an old gas installation and installed these gas boilers.